This method statement provides the control sequence of construction and methodology that will be used for the installation of dry wall with resilient material as an acoustic treatment for walls inside the area of treatment by m s optima international.
Gypsum board ceiling installation method statement.
Standard panels come in 4 foot widths and 8 10 and 12 foot lengths.
Proper scaffolding should be provided for installation work.
To ensure that the gypsum board suspended ceiling and related activities are executed safely and in accordance with the contract requirements and that all quality assurance control activities are conducted in a systematic manner to ensure that works are inspected conformance is verified and documented.
Civil method statements tags.
The long sides of the panels.
This procedure is applicable to the following works associated with.
Submission documents 2 1 technical data.
Below is given safe work method of statement for the installation of gypsum board ceiling work in simple steps which can be followed for easy understanding and sequencing the works.
This also outlines the health and safety hazards involved and include the guide on how to do the process safely.
Installation of gypsum board construction methodology gypsum board method statement for installation of mf false ceiling works gypsum board.
The general rule for hanging ceiling drywall is to install the largest panels you can handle.
Technical data test certificates installation instructions and valid.
Gypsum board ceiling installation method statement.
Masuzi june 13 2018 uncategorized leave a comment 77 views.
This method statement for false ceiling describes the details of the installation of suspended gypsum board and tile ceiling with the use of metal framings in the project.
Perimeter angle of 25mm x 25mm is set on all sides of the ceiling giving a base for gypsum board ceiling or as manufacturer instruction.
O submitted technical submittal for acoustic treatment.
Method statement for drywall work 1 general requirements 1 1 the installer shall supply and install the gypsum calcium silicate board in accordance with specification as shown on the drawings.
Obtain necessary clearances and approvals from engineers including mep clearance.